Course title
S0458002
Practice in Building Information Modeling 2

shide kazuya
Course description
To understand the difference of the three-dimensional CAD and BIM, learn the techniques and methods to use the BIM in the work of construction.
By lectures such as BIM Case Study in the design development and facility management, to learn the knowledge required for the future of construction engineers.
Purpose of class
Through BIM exercises (integration of architectural design and structure, takeoff quantity, 4D Simulation), deepen the understanding of the concept of BIM, acquire background knowledge for using BIM in the practice of the building project.
Goals and objectives

Goals and objectives Course Outcomes
1. Through the BIM of exercises, to understand the spatial structure and practical detail of architecture.
1.
,
2.
,
3.
2. Through the exercises, better understand the collaboration of design development.
1.
,
2.
,
4.
3. Acquire knowledge about the construction plans and facility operation from BIM case studies.
1.
,
2.
,
3.
Language
Japanese
Class schedule

Class schedule HW assignments (Including preparation and review of the class.) Amount of Time Required
1. Explain the BIM in building production Investigate about BIM 90分
2. Exercise 1-1. Take-off quantity by BIM Read pre-distributed materials 90分
3. Exercise 1-2. 4D simulation, crash detection Read pre-distributed materials 90分
4. View of the structural drawings
Facility management and BIM
Read pre-distributed materials 90分
5. Task 1
Modeling of Toyosu campus
Exercise 1-1.
Input of the structural member (1)
Review the steel frame construction 90分
6. Exercise 1-2.
Input of the structural member (2)
Review the steel frame construction 90分
7. Exercise 1-3.
Input of the structural member (3)
Check and see the real thing 90分
8. Exercise 1-4.
Input of the cladding
equipment
Check and see the real thing 90分
9. Exercise 1-5.
Presentation

Lecture on facility management
Investigate facility management 90分
10. Task 2
Modeling of the "library"
Exercise 2-1.
Explain the task
Prepare for the construction method 90分
11. Exercise 2-1.
Modeling (1)
Study with the text of the object CAD exercise 1 90分
12. Exercise 2-2.
Modeling (2)
Study with the text of the object CAD exercise 1 90分
13. Exercise 2-3.
Modeling (3)
Study with the text of the object CAD exercise 1 90分
14. Exercise 2-4.
Presentation
Study with the text of the object CAD exercise 1 90分
Total. - - 1260分
Relationship between 'Goals and Objectives' and 'Course Outcomes'

Submission 1 Submission 2 Report Presentation Total.
1. 10% 10% 10% 30%
2. 20% 20%
3. 10% 10% 20% 10% 50%
4. 0%
Total. 40% 20% 20% 20% -
Evaluation method and criteria
Submissions (drawing / Perth): Each 40 points (model of perfection 50%, complete 50% of the drawing)
Presentation: Each 20 points (completion of 50% of the presentation materials, presentation content 50%)
For a total of 100 points, and pass more than 60 points
Textbooks and reference materials
Textbook: to bring the text of the Practice in Building Information Modeling 1
Other materials will be timely distribution in the classroom
Prerequisites
Advance the lesson on the premise that you have take the "Practice in Building Information Modeling 1"
Office hours and How to contact professors for questions
  • e-mail
Relation to the environment
010
Regionally-oriented
Development of social and professional independence
  • Course that cultivates an ability for utilizing knowledge
  • Course that cultivates a basic interpersonal skills
  • Course that cultivates a basic self-management skills
  • Course that cultivates a basic problem-solving skills
Active-learning course
0A0
Last modified : Wed Oct 17 06:10:43 JST 2018