Class schedule | HW assignments (Including preparation and review of the class.) | Amount of Time Required | |
---|---|---|---|
1. | Guidance of the lesson | None | 0minutes |
2. | Historical trend of high-rise RC buildings in Japan part 1 -Previous earthquake disaster - |
Reading paper distributed in previous week | 60minutes |
3. | Historical trend of high-rise RC buildings in Japan part 2 -Representative projects and Japanese RC technologies - |
Reading paper distributed in previous week | 60minutes |
4. | Historical trend of high-rise RC buildings in all over the worlds part 3 -Representative projects and students presentation - |
Reading paper distributed in previous week | 60minutes |
5. | Historical trend of high-rise CFT buildings in Japan part 1 -Outline of Concrete Filled Steel Tube structures - |
Reading paper distributed in previous week | 60minutes |
6. | Historical trend of high-rise S/CFT buildings in Japan part 2 -Representative projects - |
Reading paper distributed in previous week | 60minutes |
7. | Roppongi hills observation deck viewing -to find out the particular building which each student has to report in next lesson |
Reading paper distributed in previous week | 60minutes |
8. | Roppongi hills observation deck viewing -to find out the particular building which each student has to report in next lesson |
Reading paper distributed in previous week | 60minutes |
9. | Advanced retrofitting technology using concrete butterfly blocks | Reading paper distributed in previous week | 60minutes |
10. | Advanced retrofitting technology using wooden butterfly blocks | Reading paper distributed in previous week | 60minutes |
11. | Advanced Steel fiber concrete technologies part.1 Advanced Beam-column joints system |
Reading paper distributed in previous week | 60minutes |
12. | Advanced Steel fiber concrete technologies part.2 Advanced high strength steel fiber reinforced concrete column |
Reading paper distributed in previous week | 60minutes |
13. | Final presentation for each proposal and evaluation Part. 1 | Preparing your presentation | 180minutes |
14. | Final presentation for each proposal and evaluation Part. 2 | Preparing your presentation | 180minutes |
Total. | - | - | 1020minutes |
Report | Presentation | lesson attitude | Total. | |
---|---|---|---|---|
1. | 10% | 5% | 15% | |
2. | 10% | 5% | 15% | |
3. | 10% | 5% | 15% | |
4. | 50% | 5% | 55% | |
Total. | 30% | 50% | 20% | - |