Goals and objectives | Course Outcomes | |
---|---|---|
1. | Through the BIM of exercises, to understand the spatial structure and practical detail of architecture. |
1. ,
2. ,
3.
|
2. | Through the exercises, better understand the collaboration of design development. |
1. ,
2. ,
4.
|
3. | Acquire knowledge about the construction plans and facility operation from BIM case studies. |
1. ,
2. ,
3.
|
Class schedule | HW assignments (Including preparation and review of the class.) | Amount of Time Required | |
---|---|---|---|
1. | Lecture of BIM using in pre-construction . Exercises ; Integrated model, 4D simulation, walkthrough. |
Prepare the construction BIM using the Internet etc. | 90分 |
2. | Modeling of Toyosu campus Exercise 1-1. Input of the structural member |
Check the part you do not understand in the drawing by looking at the real thing. | 90分 |
3. | Exercise 1-2. Columns, beams, floor of modeling. |
Check the part you do not understand in the drawing by looking at the real thing. | 90分 |
4. | Exercise 1-3. Modeling external walls and partition walls. |
Check the part you do not understand in the drawing by looking at the real thing. | 90分 |
5. | Exercise 1-4. In-place family. |
Check the part you do not understand in the drawing by looking at the real thing. | 90分 |
6. | Exercise 1-5. Modeling of detail, Schedule chart. |
Check the part you do not understand in the drawing by looking at the real thing. | 90分 |
7. | Exercise 1-6. Presentation. |
Preparation of presentation materials. | 90分 |
8. | Lecture on BIM for MEP. BIM applications(VR) |
Prepare for MEP engineering using the Internet. | 90分 |
9. | Explanation of visual programming Exercise: Fundamentals of visual programming 4-1 Practice of collaboration between Dynamo and Revit model |
Prepare for visual programming using the Internet. | 90分 |
10. | 4-2 Library structure and list relation in Dynamo | Prepare for computer programming. | 90分 |
11. | 4-3 Cooperation between Dynamo and Excel, control of facade. | Prepare for computer programming. | 90分 |
12. | 4-4 Cooperation between Dynamo and room information. | Prepare for computer programming. | 90分 |
13. | 4-5 Study on construction method using Dynamo -1 | Prepare for computer programming. | 90分 |
14. | 4-5 Study on construction method using Dynamo -2 Presentation |
Preparation of presentation materials. | 90分 |
Total. | - | - | 1260分 |
Exercise 1 submissions | Exercise 2 submissions | Final exam | Report | Total. | |
---|---|---|---|---|---|
1. | 10% | 5% | 15% | ||
2. | 10% | 10% | |||
3. | 10% | 10% | |||
4. | 15% | 15% | |||
5. | 20% | 20% | 10% | 50% | |
Total. | 20% | 35% | 35% | 10% | - |
Work experience | Work experience and relevance to the course content if applicatable |
---|---|
Applicatable | Teachers who worked at construction companies, part-time lecturers engaged in designing construction companies, part-time lecturers from BIM consultants teach how to use BIM and how to use them. |