Class schedule | HW assignments (Including preparation and review of the class.) | Amount of Time Required | |
---|---|---|---|
1. | Guidance and overview of network simulation -Installation and setup of Modeler -Basic operation of Modeler |
Confirm the syllabus | 20minutes |
Review the operation manual and supplement material which can be downloaded from Scomb. | 170minutes | ||
2. | Introduction of Modeler(1) -Performance evaluation of wired network model which is interconnecting three sites. -Performance improving method of the given network. |
Prepare the material which can be downloaded from Scomb. | 30minutes |
Make a report based on in-class exercises and submit it via Scomb. | 160minutes | ||
3. | Introduction of Modeler(2) -Performance evaluation of wired network model which is more complex. -Design of wired network model which is interconnetcting five sites. |
Prepare the material which can be downloaded from Scomb. | 30minutes |
Make a report based on in-class exercises and submit it via Scomb. | 160minutes | ||
4. | CSMA/CA(1) -Basic of wireless MAC protocol CSMA/CA -Difference of the CSMA/CA and CSMA/CD |
Prepare the material which can be downloaded from Scomb. | 30minutes |
Make a report based on in-class exercises and submit it via Scomb. | 160minutes | ||
5. | CSMA/CA(2) -Hidden terminal problem -Exposed terminal problem |
Prepare the material which can be downloaded from Scomb. | 30minutes |
Make a report based on in-class exercises and submit it via Scomb. | 160minutes | ||
6. | QoS control -QoS in the IP network -802.11e(HCF EDCA) |
Prepare the material which can be downloaded from Scomb. | 30minutes |
Make a report based on in-class exercises and submit it via Scomb. | 160minutes | ||
7. | MANET(1) -Overview of MANET -DSR(Dynamic Source Routing) |
Prepare the material which can be downloaded from Scomb. | 190minutes |
Make a report based on in-class exercises and submit it via Scomb. | |||
8. | MANET(2) -Treatment of routing with the terminals' movement |
Prepare the material which can be downloaded from Scomb. | 30minutes |
Make a report based on in-class exercises and submit it via Scomb. | 160minutes | ||
9. | MANET(3) -OLSR(Optimized Link State Routing) |
Prepare the material which can be downloaded from Scomb. | 30minutes |
Make a report based on in-class exercises and submit it via Scomb. | 160minutes | ||
10. | MANET(4) -Operation when route is frequently changed in OLSR |
Prepare the material which can be downloaded from Scomb. | 30minutes |
Make a report based on in-class exercises and submit it via Scomb. | 160minutes | ||
11. | MANET(5) -AODV(Ad-hoc On-demand Distance Vector) |
Prepare the material which can be downloaded from Scomb. | 30minutes |
Make a report based on in-class exercises and submit it via Scomb. | 160minutes | ||
12. | MANET(6) -Operation when route is frequently changed in AODV |
Prepare the material which can be downloaded from Scomb. | 30minutes |
Make a report based on in-class exercises and submit it via Scomb. | 160minutes | ||
13. | Sensor Network (1) - Performance evaluation of Zigbee network |
Prepare the material which can be downloaded from Scomb. | 30minutes |
Make a report based on in-class exercises and submit it via Scomb. | 160minutes | ||
14. | Sensor Network (2) - Performance evaluation of large scale Zigbee network |
Prepare the material which can be downloaded from Scomb. | 190minutes |
Make a report based on in-class exercises and submit it via Scomb. | |||
Total. | - | - | 2660minutes |
Submitted reports | Total. | |
---|---|---|
1. | 50% | 50% |
2. | 10% | 10% |
3. | 30% | 30% |
4. | 10% | 10% |
Total. | 100% | - |
Work experience | Work experience and relevance to the course content if applicable |
---|---|
Applicable | From 1991 to 2007, engaged R&D works in Communication Research Laboratory MPT, ATR adaptive communcation research laboratory, and National Institute of Information and Communications Technology. |