1. |
Basic design for new product development (target is a Kick Skater). |
Reading the syllabus of this class. |
30minutes |
2. |
Universal Design: outline explanation, organization of a development team. |
Checking the knowledge about UD by survey using Web etc. |
60minutes |
3. |
Universal Design: trial rides and team discussion. |
organizing PPP result data |
120minutes |
4. |
Review of a functional structure and Quality Function Deployment (QFD). |
Browsing in machinery magazine, for example, Nikkei MONOZUKURI. And also reviewing in class book of systems engineering A. |
120minutes |
5. |
Reverse engineering (a sketch creation). |
Reviewing about a functional design in class book of systems engineering A. |
60minutes |
Creating a function structure diagram using the sketch data |
120minutes |
6. |
Derivation of the Kando quality for Kansei value creation. |
Reviewing the method of the discussion on BS, the KJ method, the Mind Map, etc. based on class book of systems engineering
A.
|
60minutes |
7. |
Derivation of the Kando quality towards Kansei value creation, and deployment to QFD. |
Creation of a QFD matrix. |
120minutes |
8. |
Design Review (DR) for a product basic planning. |
Preparing the materials for DR. |
120minutes |
9. |
Making final product planning materials (overall plan): team activities. |
Summarizing the idea and sketch towards new product development. |
120minutes |
Making report for product specification for group |
120minutes |
10. |
Making final product planning materials (parts): team activities. |
Looking over class books of an engineering drafting method and engineering design and drafting. |
120minutes |
Making 3DCAD model |
240minutes |
11. |
Making final product planning materials (parts): team activities. |
Checking a 3DCAD manual. |
60minutes |
Making 3DCAD model |
240minutes |
12. |
Making final product planning materials (CAE): team activities. |
Checking a 3DCAD manual, especially CAE section. |
60minutes |
Making FEM analysis model |
240minutes |
13. |
Making final product planning materials (assembly): team activities. |
Arranging the part of individual work and sharing with team members. |
60minutes |
Making 3DCAD model |
240minutes |
14. |
Final presentation: presentation and discussion. |
Preparing the materials for final presentation. |
120minutes |
Making report for group |
120minutes |
Making report for individual |
120minutes |
Total. |
- |
- |
2670minutes |