| Class schedule | HW assignments (Including preparation and review of the class.) | Amount of Time Required | |
|---|---|---|---|
| 1. | Confirmation of design conditions Confirmation of target building, design policy, basic design conditions | Read Chapters 1 and 4 of the textbook | 60minutes |
| 2. | Basic plan for air conditioning equipment Plan for heat source method, air conditioning method, ventilation method | Read Chapter 4 of the textbook | 60minutes |
| Examination of heat source system and air conditioning system | 30minutes | ||
| 3. | Creation of various calculation sheets 1 Indoor thermal load calculation |
Read Chapter 2 of the textbook | 60minutes |
| Preparation of heat load statement | 60minutes | ||
| 4. | Creation of various calculation sheets 2 Aggregation of thermal load calculation, air volume calculation, air diagram |
Read Chapters 1 and 3 of the textbook | 60minutes |
| Creating a psychrometric chart | 60minutes | ||
| 5. | Selection of air-conditioning equipment 1 Selection of air handling unit and other equipment |
Read Chapter 7 of the textbook | 60minutes |
| Preparation of air conditioner selection table | 60minutes | ||
| 6. | Air conditioning equipment selection 2 Heat source selection |
Read Chapter 5 of the textbook | 60minutes |
| Preparation of heat source equipment selection table | 60minutes | ||
| 7. | Floor plan 1 Duct route plan and floor plan creation |
Read Chapter 8 of the textbook | 60minutes |
| Creating a duct floor plan | 120minutes | ||
| 8. | Various calculation forms 3 Duct resistance calculation |
Read Chapter 8 of the textbook | 60minutes |
| Creation of duct resistance calculation table | 120minutes | ||
| 9. | Floor plan 2 Piping route plan and floor plan creation |
Read Chapter 6 of the textbook | 60minutes |
| Creating a piping plan | 120minutes | ||
| 10. | 各種計算書作成4 配管抵抗計算 Various calculation forms 4 Pipe resistance calculation |
Read Chapter 6 of the textbook | 60minutes |
| Preparation of piping resistance calculation sheet | 120minutes | ||
| 11. | Creating a system diagram Creating a system diagram for equipment, piping, ducts |
Preparation of system diagram | 120minutes |
| 12. | Detailed examination Examination of layout of machine room, ceiling, PS equipment and piping |
Creating a layout plan | 120minutes |
| 13. | Collaboration with other facilities and requirements | Create detailed drawing | 120minutes |
| 14. | Design result review and comment | Creation of calculation sheets and drawings | 120minutes |
| Total. | - | - | 1830minutes |
| Interim report | Final report | Total. | |
|---|---|---|---|
| 1. | 5% | 20% | 25% |
| 2. | 5% | 20% | 25% |
| 3. | 5% | 20% | 25% |
| 4. | 0% | 25% | 25% |
| Total. | 15% | 85% | - |
| Work experience | Work experience and relevance to the course content if applicatable |
|---|---|
| Applicatable | Work experience of a building air conditioning equipment design consultant |



