| Goals and objectives | Course Outcomes | |
|---|---|---|
| 1. | The relationship between the design and structure, and between the framework and facility equipment (sanitary equipment and elevators) can be seen from the drawings. |
4.
|
| 2. | It is possible to obtain quantities and simulate processes using BIM models. |
4.
|
| 3. | It will be possible to use the cloud to carry out collaborative BIM input operations and implementation planning. |
4.
|
| 4. | Modeling can be done using visual programming. |
4.
|
| 5. | Be able to suggest ways to use BIM in construction production and maintenance operations. |
4.
|
| Submission of Assignments | Final examinations | Total. | |
|---|---|---|---|
| 1. | 10% | 10% | |
| 2. | 10% | 10% | |
| 3. | 10% | 10% | |
| 4. | 30% | 30% | |
| 5. | 20% | 20% | 40% |
| Total. | 50% | 50% | - |
| Class schedule | HW assignments (Including preparation and review of the class.) | Amount of Time Required | |
|---|---|---|---|
| 1. | 1-1 Application of BIM data , Construction BIM , Quantity calculation exercise |
Research the applications of BIM data on the Internet in advance. | 90分 |
| 2. | 1-2 Collaboration exercise using CDE , setting up a shared data environment , preparing component families , grouping, allocating roles and setting |
Prepare in advance using the handouts | 90分 |
| Learn about CDE | 90分 | ||
| 3. | 1-3 Collaboration exercise using CDE : Structure input |
Prepare in advance using the handouts | 90分 |
| Complete the structural model | 90分 | ||
| 4. | 1-4 Collaboration exercise using CDE : Inputting exterior |
Prepare in advance using the handouts | 90分 |
| Complete the structural model | 90分 | ||
| 5. | 1-5 Collaboration exercise using CDE : Inputting walls and floors |
Prepare in advance using the handouts | 90分 |
| Research fire compartments and their construction specifications. | 90分 | ||
| 6. | 1-6 Collaboration exercise using CDE : inputting and drawing interior design |
Prepare in advance using the handouts | 90分 |
| Check the interior restrictions | 90分 | ||
| 7. | 1-7 Collaboration exercises , overall coordination , and drawing using CDE |
Complete your work and turn in your assignment | 180分 |
| 8. | 2-1 Examples of BIM model applications , interference checks, construction simulation , animation , parametric modeling |
Research the applications of BIM models on the Internet in advance. | 90分 |
| 9. | 2-2 Visual programming (Dynamo) - Basics of Dynamo - Linking with Revit models, linking with room information |
Prepare in advance using the handouts | 90分 |
| Preparing the execution environment | 90分 | ||
| 10. | 2-3 Visual programming (Dynamo) - Library configuration, linking with lists |
Prepare in advance using the handouts | 90分 |
| Review of the previous lesson | 90分 | ||
| 11. | 2-4 Visual programming (Dynamo) , integration with Excel, facade control |
Prepare in advance using the handouts | 90分 |
| Review of the previous lesson | 90分 | ||
| 12. | 2-5 Visual programming (Dynamo) - Automatic wall generation |
Prepare in advance using the handouts | 90分 |
| Review of the previous lesson | 90分 | ||
| 13. | 2-6 Visual programming (Dynamo) and Python script usage |
Prepare in advance using the handouts | 90分 |
| Review of the previous lesson | 90分 | ||
| 14. | 2-7 Visual Programming (Dynamo) Final Exam |
Review the previous content | 180分 |
| Total. | - | - | 2340分 |
| ways of feedback | specific contents about "Other" |
|---|---|
| Feedback in outside of the class (ScombZ, mail, etc.) |
| Work experience | Work experience and relevance to the course content if applicable |
|---|---|
| Applicable | A professor who has worked in construction management, design, and research and development at a construction company, a part-time lecturer who works in design at a construction company, and a part-time lecturer who is a BIM consultant will use their own experiences to teach how to use and think about BIM with a focus on construction. |